Central Plant c Jasmax 01
Central Plant aerial c Jasmax
CP Tunnel c Jasmax
Cp wetdry diagram jasmax
Cp diagram jasmax
The 210m-long services tunnel provides a below-ground connection between the Central Plant Building (centre-right) and Auckland City Hospital
Separation of electrical and water infrastructure for resilience and operational integrity
1 / 3
010
004
Chiller hall
Back-up generator hall (L), and rooftop cooling tower platform (R)
1 / 2

Project Details

Client
Te Whatu Ora Te Toka Tumai | Auckland
Sector
Health & Science
Location
Tāmaki Makaurau Auckland
Discipline
Architecture
Status
Completed: 2026
Size
Central Plant Building (A40): 5,230sqm, Tunnel: 210m
Design Collaborators
Beca, Aurecon

Related